Loading...
  • 2 Connect
  • 2 Connect
  • 2 Connect
  • 2 Connect
  • 2 Connect
  • 2 Connect

Project Details

  • Client: 2 Connect
  • Place: Luna (Romania)
  • Date: October 2017

Project Story

Lots of working hours are very tipical in a factory specialized in technical products like 2 Connect. This company has trusted SILVERSUN for the replacing of its lighting systems. Fixtures with tubes of 58W harbour now LED tubes with only 23 watts, and old vapour sodium high bays were replaced by LED, which means a money saving near to 50%, besides lower maintenance and energy waste.

Before: 30 High bays 200W | 250 Fluorescents 58W | 18 Conventional luminaires 40W

After: 30 High bays 100W | 250 T8 Tubes 23W


See more