Loading...
  • Kuehne+Nagel
  • Kuehne+Nagel
  • Kuehne+Nagel
  • Kuehne+Nagel
  • Kuehne+Nagel
  • Kuehne+Nagel

Project Details

  • Client: Kuehne+Nagel
  • Place: Madrid (Spain)
  • Date: March 2018

Project Story

A conventional lighting system in a big office building means a lot of money. The Spanish base of this German logistics company, located in Madrid, used to spend 1200€ per months on the electricity bill. With the replacement of the old luminaires by SILVERSUN LED panels, downlights and spots the company has achieved energy savings of 120000kWh/year and 850€ less per month on electricity costs.

Before: 424 Fluorescents 4x18W | 286 Downlight 8'' 2x26W

After: 369 Panels 60x60 36W | 54 Downlight 8'' 20W | 18 Spots 10W


See more